Valuation of Photovoltaic Projects in The Development Phase Using the Modified Option Method
Sustainable Energy - Valuation, and Transformation: 42NRG 2023
The motivation for conducting a study on the valuation of projects in the development phase using a modified option method was the need to test the prevailing view in the literature that the cash flows that a project would generate during the operating period are…